베트남, Trieu De 펌프스테이션 펌프 공급 및 설치
keianews
2015-03-18 15:29
조회수: 13,404회
제목 베트남, Trieu De 펌프스테이션 펌프 공급 및 설치
국가 베트남
분야 물환경
지역 베트남 하노이
기간 2015-02-26~2015-04-13
발주처명 -
출처(URL) 한.베환경산업협력센터
내용
베트남 환경산업 최신입찰 정보
공 고 명
Trieu De 펌프스테이션 펌프 공급 및 설치
Package No.1 on supply and installation of pumps for Trieu De pumping station, Vinh Phuc Province
기본정보
사 업 명
Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces
사업지역
베트남 빈푹
발 주 처
Vinh Phuc DARD PMU
자금출처
ADB
계약방법
국제경쟁입찰(ICB)
추정가격
1.32million USD (한화 약 14억원)
상세정보
공고 게시일
2015/2/26
신청마감일
2015/4/13 9:00am
사업 내용
/자격 조건
1. 사업내용
Package No.1 on supply and installation of pumps for Trieu De pumping station, Vinh Phuc Province.
2. 자격조건
Experience requirements:
(a) The Manufactures shall have at least ten (10) years of experience in producing submersible pump units. During the last 10 years, the Manufacturer must have sold a minimum of fifteen (15) submersible pump units, each with capacity of at least 12,000m3/hr, which have been operating without major defects.
(b) The bidder, within the last ten years, shall have either:
i. 01 successfully completed contract valued at least US$ 900,000 as main supplier to supply submersible pump units for pumping station with the total capacity of at least 50,000 m3/hr and where each pump unit has capacity of at least 12,000 m3/hr and 01 contract of installation of pump station with each submersible pump unit capacity of at least 12,000m3/hr.
or,
ii. 01 successfully completed contract valued at least US$ 900,000 as main supplier to supply and install submersible pump units for pumping station with the total capacity of at least 50,000 m3/hr and where each pump unit has capacity of at least 12,000 m3/hr.
Financial requirements:
The Bidder shall furnish audited financial statements or financial statements certified by applicable tax authority in accordance with local legislation for the last three (3) years (2011, 2012 and 2013) that it meets the following financial requirement(s):
(a) Current soundness of the Bidder’s financial position and its prospective long-term profitability is demonstrated through audited financial statements or financial statements certified by applicable tax authority in accordance with local legislation for the last three years (2011, 2012 and 2013). As a minimum, a Bidder's net worth calculated as the difference between total assets and total liabilities should be positive.
(b) The average annual turnover required should be at least 1.5 million US Dollars defined as the total payments received by bidder for contracts completed within the last three (3) years. In case of a joint venture, all partner combined must meet the requirement, while one partner must meet 50 and each partner must meet 30 of the requirement.
발주처 연락처 -
팩 스 -
주 소 Vinh Phuc Project Management Unit, No. 98 Nguyen Viet Xuan Street, Dong Da Ward, Vinh Yen City, Vinh Phuc Province, Vietnam
담 당 자 -
이 메 일 -
첨부파일 -
관련서류 : 입찰서 USD 100 (배송비 USD50 별도)
계약기간 -
문의처
한베환경산업협력센터
사무소 위치
베트남 하노이
이 메 일
vkecc@keiti.re.kr
전화번호
84 4 2220 8210
팩 스
84 4 2220 8211
한베환경산업협력센터(VKECC)는 우리나라 환경기업의 성공적인 베트남 환경시장 진출을 돕기 위한 목적으로 한국환경부가 설립하고 한국환경산업기술원이 관리하는 공공기관입니다.
첨부 | 국제입찰정보(베트남)_ Trieu De 펌프장 펌프 공급 및 설치 (2015.2.26).jpg
|
---|
번호 | 제목 | 작성자 | 작성일 |
---|---|---|---|
330 | 베트남, 먼지필터시스템 및 압축기 공급, 설치 및 교육 | keianews | 2015-03-18 |
329 | 베트남, Long Xuyen시 하수처리사업 | keianews | 2015-03-18 |
열람중 | 베트남, Trieu De 펌프스테이션 펌프 공급 및 설치 | keianews | 2015-03-18 |
327 | 베트남, Mekong 통합 수자원 관리 | keianews | 2015-03-18 |
326 | 2015년 오라클 데이터베이스 유지관리 적격심사 입찰공고 | keianews | 2015-03-18 |
325 | 2015년 유체유동 교정시스템 유지관리 용역 | keianews | 2015-03-18 |
324 | 담양군 친환경 지속가능도시 조성사업 종합계획 수립 | keianews | 2015-03-18 |
323 | 성주군 신천 생태하천복원사업 기본 및 실시설계 | keianews | 2015-03-18 |
322 | 멕시코 레온시 태양광발전시설 설치사업 타당성조사 용역 | keianews | 2015-03-11 |
321 | 연속형 라돈측정기 소액수의 견적제출 공고 | keianews | 2015-03-11 |